Premier Le Reve Hotel
The project involves the addition and construction of columns and a concrete slab for a mezzanine floor in the hotel.
Includes the following:

- Installation of new interior column reinforcements.
- Installation of reinforcements to connect the new concrete slab.
- Breaking and leveling of existing concrete surfaces to ensure the stability of the new concrete.
- Reinforced concrete works for new columns in the basement.
- Reinforced concrete works for new columns below the new slab.
- Reinforced concrete works for the new concrete slab.
- Reinforced concrete works for new columns above the new slab
- The company has executed the work above items according to the technical specifications, industry standards, and the instructions of the supervising engineer within the predetermined timeframe, as agreed upon in the contracts. The work has been carried out with a high level of professional and technical performance.