Saya World in Hurghada
The project includes a sports hall, a health club, a restaurant, and a café. The project occupies an area consisting of a ground floor, upper floors, rooftop rooms, and an elevator shaft
Includes the following

- Completion and expansion of excavation works.
- Ordinary Concrete works for foundations and sloping concrete for the roof.
- Full reinforced concrete works.
- Complete building works.
- Moisture insulation works (foundations, backfilling, internal and external insulation for water tank, roof insulation) Heat insulation works for the roofs.
- Complete interior plastering works. Complete exterior plastering works for the facades.